地役权放弃权利

If you would like to request that 西班牙&E quitclaim easement(s) encumbering your property, you will need to complete our Quitclaim Request form. Your request must be accompanied by the appropriate documents listed below and a nonrefundable application fee. See Quitclaim Request form for current fees. 

读了 Land Use Constraints and FAQS quick reference guide for potential CPUC Sections 851 - 857 and CPUC Tribal Land Transfer Policy constraints.  Links to these code and policy details can be found on the 土地服务 主页. 

 

地役权放弃权利

Quitclaim Request Process

Complete our online Quitclaim Request form submit plans and any other relevant information.

Completed application package will be circulated internally and reviewed to determine if requested quitclaim can be granted.

If there are existing 西班牙&E设施 within the easement area, we are unable to process your request, until such time as 西班牙&E设施 have been completely removed or relocated. 

如果西班牙&E can accommodate your request, we will prepare the quitclaim, subject to CPUC approval if applicable. 

If CPUC approval is required, 西班牙&E will prepare and file an advice letter or application to the CPUC. Upon CPUC approval, 西班牙&E can grant the quitclaim. 

西班牙&E will record the executed quitclaim with the appropriate county and a copy will be returned to you.

文档提交 

  1. Complete our online Quitclaim Request form below. 
  2. Submit completed request form and all of the following applicable documents to the 土地服务 department at (电子邮件保护)

 

文件列表
  • Map or plan illustrating the easement location and any existing or proposed 西班牙&E设施
  • 标题报告
  • Any other relevant documents that pertain to your request
  • Completed Quitclaim Request form
1.82 MB
PDF
Quitclaim Request Form
Quitclaim Request Form

Frequently Asked Questions

An easement or right-of-way is a right to use the property of another for certain purposes. 西班牙&E obtains easements on property, 归他人所有, for the right to install, 维护, operate and access our facilities on that property, 归他人所有, for the right to install, 维护, operate and access our facilities on that property. The easement may restrict certain uses within the easement or right-of-way area, for the purpose of 维护ing encumbered access to 西班牙&E设施, allowing us to 维护 safe and reliable systems. An easement or right-of-way remains in effect and transfers with the property to any new owners. 

一个西班牙&E utility corridor is a strip of land that forms a passageway through which 西班牙&E installs, operates and 维护s its gas and electric facilities both above and below ground. 一个西班牙&E utility corridor can either be located within land owned by 西班牙&E, or within land owned by another upon which 西班牙&E has an easement or right-of-way.

An encroachment occurs when a person builds on or intrudes on, 下, or over the property of another, including within an easement, without permission from the property or easement holder.

Property owners should refer to their property title report or title policy to determine the presence of any easements on their property.

Any item or activity that could interfere with the safe and reliable operation of 西班牙&E’s facilities is called an encroachment, which is prohibited 下 the terms of the easement along with any prohibited encroachments by City, 状态, 和联邦政策. 西班牙&E actively enforces rights granted by our easements, and protected by these government policies, to ensure reliable operation of our electric and gas systems.

The Owner of the property has the responsibility to 维护 clearance of all encroachments from an 西班牙&E地役权, which can include clearing of vegetation, 垃圾, or any other materials that interfere with 西班牙&E设施. 西班牙&E’s easements give us the right, but not the obligation, to trim trees and remove vegetation as needed.  西班牙&E may choose to enforce its easement rights to require such clearing at the property owner’s expense.

西班牙&E has the right to use an easement or right-of-way for specific purposes including access to and from its gas and electric facilities for maintenance and construction. 西班牙&E may enforce these rights and rights granted through government policies, by requiring the encroachment be removed at the property owner’s expense.

在西班牙&E, we take great care to keep our facilities clear of anything that might cause a safety or reliability issue.  可持续发展目标内的用途&E地役权 or right-of-way are usually very limited in scope and type.   Uses of any type require written consent from 西班牙&E along with adherence to all California Public Utilities Commission (CPUC) General Orders and OSHA standards. Certain encroachments may require approval from the CPUC.  If you have an existing project number from 西班牙&E 建筑服务 or Service Order Team, you can submit an 入侵的请求 对西班牙&E审查.

If you have an easement maintenance concern, please email 西班牙&E 土地服务 Department at (电子邮件保护).

联系信息

For questions regarding an 西班牙&E地役权 or right-of-way

Email the 土地服务 Department at (电子邮件保护) if you have questions regarding a 西班牙&E地役权 or right-of-way.

For general inquiries, NOT related to land rights, 联系西班牙&E 客户服务 at 1-800-411-7343. 

For inquiries regarding vegetation management

访问我们的 Vegetation Management 页面.

Email Vegetation Management at (电子邮件保护) or Call (858) 654–8608

Call 811 Before You Dig 

Please call 811 for Dig Alert before you dig. DigAlert must be called at least 2 working days in advance of digging but no more than 14 days before digging is to start. If digging is not complete within 28 days of mark out, then DigAlert must be called to mark out again. Mark out must be redone every 28 days until excavation (digging) is completed.  Mark out is provided free for the first mark out.  西班牙&E will send a crew to mark the 下ground gas and electric facilities before you begin work, helping you to plan a safe project.  For detailed DigAlert information go to http://digalert.org/calaw-full